01 January 2007

Refit

Well the bottom job is done and it was not nearly as bad as I thought it would be. It had been about 6 years since the last one. I installed two 1.5 inch cockpit drains at the front of the cockpit. Then started sanding the inside of the cabin. This has to be one of my least favorite jobs ever. I would rather replumb the sewer system on an old house. Which I just did last month, along with working on leveling the house. Much less arduous than sanding.
The to do list: install new bilge system, rewire boat, paint, install life line netting, cabin heater and I'm sure there is more.
I go back tomarrow so there will be a new list at the next post. Hopfully some of these items will be done.

Tom

0 Comments:

Post a Comment

<< Home